Case Studies » Tanking out / Waterproofing a hospital plant room
Water leaking from plant and entering hygiene critical areas below..
We proposed the 'tanking out' of the entire plant with a seamless and flexible coatings system to contain any water leaking from the plant and machinery. The substrate was prepared using a vacuum controlled diamond grinder to remove surface contaminants and raise a profile prior to coating application. A bund was created using fair faced blocks bound with a resin rich epoxy mortar. This was followed by the installation of a spoon cove at the floor/wall intersection to isolate this known weak point. All penetrations into/through the slab were sealed with a high modulus polyurethane jointing compound.
|
THE PROBLEM
THE SOLUTION